At a glance: Restaurant kitchen makeup air decides whether a Florida restaurant holds a slight positive pressure or pulls humid outdoor air through its doors, walls, and ceiling. This guide explains the physical mechanism, compares five makeup air approaches with their limits, lists what drives cost and schedule, and covers how the work is sequenced around an open restaurant. It also dates the code changes that take effect with Florida’s 9th Edition building codes on December 31, 2026, and closes with a decision checklist your engineer, balancer, and operations team can each act on.
Restaurant kitchen makeup air is the HVAC variable that decides whether a Florida restaurant holds a slight positive pressure or pulls humid outdoor air through every door, wall cavity, and ceiling plenum it has. A restaurant with hard-to-open doors, sweating diffusers, or smoke rolling out past the hood has an air balance problem first and an equipment problem second, and the correction starts with a measured test and balance before any equipment is priced. Getting the order wrong buys a replacement unit that cannot cure the symptom, leaves a kitchen crew working in heat and smoke, and grows mold behind finishes never meant to get wet. This article does not argue that every kitchen needs a new dedicated makeup air unit, because many need a belt, a damper, a control interlock, or a rebalance, and the measurement shows which.
What Changes for Restaurant Kitchen Makeup Air When Florida’s 9th Edition Code Takes Effect?
Florida’s 9th Edition (2026) building codes take effect on December 31, 2026, with three changes that bear on kitchen ventilation. Miami-Dade County’s 9th Edition code change notice states that permit applications and plans submitted on or after that date must comply with the new edition, so the submission date belongs in the project schedule from the first meeting.
The Florida Building Commission’s Analysis of Changes for the 9th Edition (2026) Florida Building Code, Mechanical flags two kitchen provisions. Section 508.1.1 is clarified so the kitchen HVAC system is either designed to absorb the makeup air load or the makeup air gets its own conditioning system, with the 10-degree Fahrenheit limit measured against the kitchen thermostat setpoint. New Section 507.1.3 bars appliances with draft hoods or atmospheric burners from sharing a room with a Type I or Type II hood unless they sit in a sealed enclosure with a self-closing door and their own combustion air. A kitchen pulled negative by its hood can draw flue gas back down a draft hood.
The 9th Edition (2026) Energy Conservation code overview posted by the Florida Building Commission states that demand control kitchen ventilation (DCKV) is now required for Type I hood systems with a total exhaust rate greater than 5,000 cfm, and that those controls must modulate exhaust and replacement air together. Separately, Addendum c to ASHRAE Standard 154-2022, approved July 31, 2026, adds an informative note telling air balancers to test space pressurization at both minimum and maximum airflow, and states that DCKV minimum settings must not fall below the makeup air unit’s minimum operating airflow. A kitchen balanced only at full exhaust can drift negative or positive the moment the controls turn down.
Why Does a Restaurant Kitchen Go Negative, and What Does Florida Humidity Add?
Restaurant kitchen makeup air is outdoor air brought in mechanically to replace the air a hood exhausts. Code requires it to run whenever the exhaust runs and to roughly equal the building’s total exhaust. In Florida it must also be dehumidified, or absorbed by HVAC equipment sized for the load, or the building pulls humid air in through doors and walls.
Building pressure is the net result of every airflow crossing the envelope: hood, restroom, and dishwasher exhaust out, dedicated makeup air and rooftop unit outdoor air in. The International Code Council’s technical article on IMC Section 508 explains that Section 508.1 requires makeup air whenever kitchen exhaust operates, in an amount approximately equal to total exhaust, with mechanical makeup air interlocked to the exhaust fan. When supply falls short, the difference enters through the storefront door, roof penetrations, wall cavities, and the ceiling plenum.
In a cold climate this is a heating complaint; in Florida it is a moisture problem. Infiltrated air never passes over a cooling coil, so its moisture reaches cold supply diffusers, uninsulated duct runs, and the back side of vinyl wall covering, and it condenses there. EPA’s moisture control guidance warns that in hot, humid climates even slight negative interior pressure can pull outdoor moisture into chilled wall cavities, and suggests a slightly positive building may help. The dining room rooftop units then carry a latent load they were never sized for.
Field data suggests the condition is common. A field study published in ACHR News in May 2026, conducted by Budderfly, a company that sells kitchen monitoring and DCKV, reported in its summary table that 91% of the quick-service kitchens it measured ran net-negative and that 46% of the makeup air units it cataloged were not working at the time of testing. The article’s own text gives different counts for a smaller subset, and the study has not been peer reviewed, so the figures indicate direction rather than a rate to plan around.
| Symptom in the restaurant | Physical cause | What the balancer measures |
|---|---|---|
| Front or rear door is hard to open, or slams | Exhaust exceeds total supply; the building sits below outdoor pressure | Building pressure across the envelope with all hoods and units at design airflow |
| Smoke or heat spills past the front of the hood | Replacement air arrives as cross drafts through doors, or makeup air discharges too fast near the hood | Hood exhaust airflow, makeup air airflow, and discharge velocity near the hood |
| Diffusers, ducts, or walls sweat; ceiling tiles stain | Unconditioned humid air reaches surfaces below its dew point | Space temperature and humidity, makeup air leaving conditions, infiltration paths |
| Kitchen odor in the dining room | Kitchen held too close to neutral, or dining room negative to kitchen | Pressure between kitchen and dining room, transfer airflow direction |
| Rooftop units run constantly and cannot hold humidity | Units are absorbing untreated outdoor air the makeup air system should have handled | RTU outdoor air damper positions, delivered airflow, coil leaving conditions |

Which Makeup Air Approach Fits a Florida Restaurant, and Where Does Each Fall Short?
Five approaches cover most restaurant kitchens, and each works only under its own conditions: total exhaust in cfm, hood type, hours at full exhaust, spare rooftop unit capacity, and the roof’s ability to accept new curbs. Your mechanical engineer selects the approach; the table shows where each one tends to fit and where it falls short.
| Approach | How it works | Where it fits | Where it falls short |
|---|---|---|---|
| Rooftop unit outdoor air plus transfer air | Dining room RTUs bring in extra outdoor air that moves to the kitchen and leaves through the hood | Small exhaust volumes with RTU capacity to spare | RTUs must be sized for the full makeup air latent load; a closed or failed damper sends the building negative |
| Untempered dedicated makeup air unit | Fan-and-filter unit interlocked with the exhaust, discharging outdoor air near the hood | Kitchens where the code path allows the HVAC system to absorb the load | Delivers raw Florida outdoor air; heat and humidity land on the cooks and the kitchen RTU |
| Conditioned makeup air unit | Dedicated unit with a DX cooling coil that cools and dehumidifies makeup air before delivery | Larger exhaust volumes and full-service kitchens | Higher first cost, electrical load, and maintenance; needs its own refrigerant circuit service |
| Dedicated outdoor air system (DOAS) | A unit that conditions all building outdoor air, often with energy recovery, feeding dining and kitchen | Open-plan or small-footprint restaurants | More complex controls and commissioning; the kitchen runs short if transfer paths from the dining room are blocked |
| DCKV added to any of the above | Sensors slow exhaust and makeup air together at low cooking load | Long operating hours with varied cooking load; required above 5,000 cfm under the 9th Edition | Savings depend on cooking schedule and staff use; must be balanced at minimum and maximum airflow |
The cheapest approach to install can be the most expensive to operate in Florida, because untreated outdoor air moves its latent load onto equipment that was never sized for it. Demand control has a documented upside with limits. California Energy Commission report CEC-500-2021-021, prepared by Frontier Energy, found that DCKV added more than 50% ventilation energy savings at two of the six California sites tested, and that staff behavior was essential to keeping savings over time. A kitchen at full load all day gains little. A new makeup air unit also cannot rescue a hood that is undersized, poorly positioned, or fighting cross drafts from a door. Overcorrection is a failure too: a building pushed well positive forces kitchen odor into the dining room and holds doors open.
What Drives the Cost and Schedule of a Makeup Air Correction?
No published cost range applies to a specific Florida restaurant, and Advanced Air Systems does not publish pricing. Any figure quoted without the total exhaust in cfm, the conditioning method, and the roof conditions is a sales number. The drivers below move the budget and the schedule, and each one can be documented before bids are compared.
| Driver | How it moves budget and schedule | Source and date |
|---|---|---|
| Total Type I hood exhaust (cfm) | Sets makeup air volume and unit size; above 5,000 cfm adds DCKV controls on Type I hood systems | FBC Energy Conservation 9th Edition overview, effective Dec 31, 2026 |
| Hood listing and exhaust rate per linear foot | Oversized exhaust drives oversized makeup air; the 9th Edition adds a maximum net exhaust table | FBC Energy Conservation 9th Edition overview, Table C403.2.8 |
| Conditioning method | Untempered, DX-conditioned, or DOAS changes first cost, electrical service, and refrigerant work | FBC Mechanical 9th Edition analysis, Section 508.1.1 |
| Condition of existing equipment | A failed belt, damper actuator, or interlock is a repair; a corroded cabinet or coil is a replacement | Field condition; confirmed by test and balance |
| Roof, curb, and crane access | New curbs, structural review, and crane picks add engineering and scheduling steps | Engineer of record and site conditions |
| Permit submission date | Determines which code edition the design must meet | Miami-Dade County notice, Dec 31, 2026 effective date |
| Balancing at two airflows | Adds test time for DCKV kitchens but prevents callbacks | ASHRAE 154-2022 Addendum c, approved Jul 31, 2026 |
Repair and replacement each have their place. A makeup air unit with a sound cabinet and coil that stopped delivering air because of a belt, a stuck damper, or a broken exhaust interlock is a repair and a rebalance. A unit with salt-air corrosion through the casing, repeated motor or compressor failures, or a capacity that no longer matches the hood line points toward rooftop unit change-outs or broader commercial HVAC retrofits.
How Is Makeup Air Work Done Without Closing the Restaurant?
Restaurants stay open during most makeup air work, so the schedule is built around service periods. The first test and balance happens during a normal service, because a kitchen measured with the fryers off does not represent a Friday dinner rush. Shutdowns of the exhaust and makeup air system fall after close or between lunch and dinner. Exhaust and makeup air work is never staged during cooking.
Crane picks are scheduled before opening with the lift zone closed to parking and deliveries. Advanced Air Systems can draw on the Advanced family of businesses’ in-house crane, sheet metal, and roofing divisions, which keeps the curb, the flashing, and the lift under one schedule. South Florida’s afternoon thunderstorms set a practical cutoff for open roof penetrations. Grease discharged from kitchen exhaust fans degrades many roof membranes, so the roof around the fans should be inspected at the same visit through a program such as Advanced Roofing’s roof maintenance program.
The hood, grease duct, and fire suppression system are inspected by the local fire official, and any work that touches the hood is coordinated with the restaurant’s fire suppression contractor before the shutdown is scheduled. In Miami-Dade and Broward Counties, rooftop equipment attachment falls under the High-Velocity Hurricane Zone provisions of the Florida Building Code, and the engineer of record and the building official decide the attachment design. Close-out includes the final balance report, the control sequence, and the filter and belt schedule that a preventive maintenance program will follow.
Which Code Edition and Rules Apply to Your Project, and When?
As of November 12, 2026, the 8th Edition (2023) Florida Building Code remains in effect, and the 9th Edition (2026) takes effect on December 31, 2026. A makeup air project permitted before that date is generally designed to the 8th Edition; one submitted on or after it must meet the 9th, including the Section 508.1.1, 507.1.3, and DCKV changes described above. Ask your engineer to state the edition in writing.
Refrigerant rules affect conditioned makeup air units and rooftop units. EPA’s Technology Transitions rule, as amended in May 2026, removed the January 1, 2026 installation deadline for residential and light commercial systems using refrigerants with a global warming potential of 700 or greater that were manufactured or imported before January 1, 2025. Newer packaged equipment generally uses A2L refrigerants, which call for trained technicians and code-compliant installation. A working R-410A unit does not have to be replaced because of the rule. Confirm the current status before you finalize a specification.
What Should Be on Your Makeup Air Decision Checklist?
Each item has an owner, so the list can go straight into a kickoff meeting.
- Operations manager: log door resistance, smoke spill, sweating diffusers, and dining room odor by time of day for two weeks.
- Facilities director: commission a test and balance at peak cooking before requesting bids, with building pressure, hood exhaust, makeup air, and RTU outdoor air readings.
- Air balancer: on any kitchen with DCKV, measure space pressurization at both minimum and maximum airflow, per ASHRAE 154 Addendum c.
- Service contractor: inspect belts, dampers, filters, and the exhaust interlock, and price repair separately from replacement.
- Mechanical engineer of record: state the makeup air conditioning path under Section 508.1.1 and confirm whether total Type I exhaust exceeds 5,000 cfm.
- Engineer and building official: confirm the governing code edition from the permit submission date, and the HVHZ attachment design in Miami-Dade and Broward.
- Kitchen designer: list every appliance with a draft hood or atmospheric burner in the hood room and plan for Section 507.1.3.
- Property manager: issue written notice of every shutdown and crane pick, and file the final balance report.
- Owner or CFO: compare bids on the same measured exhaust and makeup air volumes, the same conditioning method, and the same balancing scope, using our guide on how to select a commercial HVAC contractor.
Frequently Asked Questions
How much makeup air does a commercial kitchen need?
About as much as the building exhausts. Section 508.1 of the Florida Building Code, Mechanical requires makeup air from all sources to roughly equal total exhaust, including hoods, restrooms, and dishwashers, and requires mechanical makeup air to run whenever the exhaust runs. The mechanical engineer of record sets the design figure from the hood listing and the appliance line.
Why is my restaurant’s front door hard to open?
The building is almost certainly under negative pressure. Exhaust is removing more air than makeup air and rooftop units supply, so outdoor pressure pushes against the door. Common causes are a failed makeup air fan belt, a closed outdoor air damper, a broken interlock, or a hood running faster than designed. A test and balance at peak cooking finds which one.
Can a rooftop unit provide makeup air for a restaurant kitchen?
Yes, in some kitchens. Dining room rooftop unit outdoor air that transfers to the kitchen can count toward makeup air if the units can cool and dehumidify it and the dampers hold position. It fails when a damper sticks or exhaust grows with a new hood.
Does makeup air have to be air conditioned in Florida?
Not always. Section 508.1.1 allows either a kitchen HVAC system designed to absorb the makeup air load or a dedicated system that conditions makeup air to within 10 degrees Fahrenheit of the kitchen setpoint, as clarified in the 9th Edition. In Florida, your engineer should also show how the latent load is handled.
Is demand control kitchen ventilation required in Florida?
It will be for larger kitchens. The 9th Edition Florida Building Code, Energy Conservation, effective December 31, 2026, requires demand control kitchen ventilation on Type I hood systems with total exhaust greater than 5,000 cfm, with exhaust and replacement air modulating together. The permit submission date determines which edition applies to your project.
How often should a restaurant’s air balance be tested?
Test at commissioning, after any change to hoods, exhaust fans, rooftop units, or controls, and whenever negative-pressure symptoms return. Kitchens with demand control ventilation should be balanced at both minimum and maximum airflow, as ASHRAE 154 Addendum c recommends. Between tests, preventive maintenance on belts, dampers, filters, and the exhaust interlock limits drift.
Measure the Building Before You Buy the Equipment
Restaurant kitchen makeup air problems in Florida show up as stuck doors, smoke spill, and wet surfaces, and they trace back to the balance between what the hood removes and what the building brings in and conditions. The code record supports measuring first. Section 508.1 ties makeup air to total exhaust, the 9th Edition ties its temperature to the kitchen setpoint and restricts draft-hood appliances near hoods, and ASHRAE 154 Addendum c asks for pressure readings at both ends of the airflow range. A measured test and balance shows whether the fix is a belt, a damper, a control sequence, or new equipment, and documents the decision. With the December 31, 2026 code change weeks away, the submission date is part of that decision too.
Written by The Technical Team at Advanced Air Systems. Established in 1994, Advanced Air Systems is 100% employee-owned and a division of Advanced Roofing Inc., serving occupied commercial buildings from South Florida offices that include its Fort Lauderdale commercial HVAC and Miami commercial HVAC locations.
If your restaurant shows signs of negative pressure or you are planning a kitchen remodel, request a quote or call Advanced Air Systems at (954) 332-1418. For existing equipment, see our commercial air conditioning repairs page; for a restaurant build-out, see new construction HVAC installation.